Discuss a task
Home/Case studies

Implementation case studies

Real projects at assets in Russia and the CIS: the task, the work done and a measurable result. Customer names are not disclosed under contract terms.
AllPipelinesTreatmentRotating equipmentPowerWells and production
PIPELINE.SLE
Interface of the asset digital twin
Case · PIPELINE.SLE · Pipelines
+12% transport energy efficiency and −17% CAPEX on pigging
High-wax asset · real-time wax monitoring · pigging by condition instead of by schedule
View case →
PIPELINE.SLE
Interface of the asset digital twin
Case · PIPELINE.SLE · Pipelines
Gas slugs eliminated and extra production at a field with complex terrain
Stabilised hydraulics of the gathering network · safe reduction of line pressure
View case →
PREDICT.SLE
Interface of the asset digital twin
Case · PREDICT.SLE · Pipelines
From frequent ruptures to a remaining-life forecast for every section
100+ parameters · 5 years of data · risk map and maintenance plan
View case →
PREDICT.SLE
Interface of the asset digital twin
Case · PREDICT.SLE · Pipelines
A 5–10-year pipeline replacement investment programme
Private oil producer · life-cycle cost · service life extension by condition
View case →
PROCESS.SLE
Interface of the asset digital twin
Case · PROCESS.SLE · Treatment
No more treatment upsets and +1.5% marketable oil yield
CPF of a large field · self-calibrating HYSYS model · 6 months of pilot operation · −7% demulsifier
View case →
DYNAMICS.SLE
Interface of the asset digital twin
Case · DYNAMICS.SLE · Rotating equipment
Transition to condition-based maintenance and +12% productive time
Water injection pumps · −65% emergency shutdowns · integral condition parameter
View case →
SHIELD.SLE
Interface of the asset digital twin
Case · SHIELD.SLE · Pipelines
Two illegal taps found, losses stopped
Interfield oil pipeline · sensitivity from 0.5% of flow · localisation
View case →
ENERGY.SLE
Interface of the asset digital twin
Case · ENERGY.SLE · Power
−4% electricity costs in production and a grid without overloads
ESP wells on intermittent operation · consumption forecast · reactive power distribution · 6 months of pilot operation
View case →
Results were obtained in pilot operation and deployments at specific facilities; the effect at another asset is estimated after a pre-project survey. Illustrations are frames of the demonstration field in the asset digital twin.
Sample case page

+12% transport energy efficiency and −17% CAPEX on pigging at a high-wax asset

PIPELINE.SLE · oil producer · asset with high paraffin content
  • Context. A gathering system whose flowlines regularly build up wax deposits. Pigging and additive dosing followed fixed schedules.
  • Problem. Wax restricted the flow area with no monitoring or forecast; the effectiveness of pigging and dosing programmes was not assessed; some pigging runs were unnecessary.
  • Solution. PIPELINE.SLE AI agent: real-time monitoring of wax and hydrate formation, integration with the production management system to find optimal transport modes.
  • Implementation. Review of pigging and dosing programmes → production forecast accuracy for the waxy wells → 5 years of lab analyses → agent deployment → integration → pilot operation.
+12%
energy efficiency of well stream transport
−17%
CAPEX of the integrity programme through pigging frequency
Pigging on the model: the pig is visible on the trunk line, the twin recalculates the restriction and pressure drop
Pigging on the model: the pig is visible on the trunk line, the twin recalculates the restriction and pressure drop
What it gives the business. Pigging is done when it is needed; transport energy goes down without losing flow stability; the integrity programme is planned by actual condition.
A similar task at your asset?
We will show the solution on your facility's data and estimate the expected effect before implementation starts.